You are currently in: Scoping Reports Summary | SEA | Environment

Scoping Reports Summary

All documents available from this web site have been created using Adobe Acrobat 7. A free version of Adobe Acrobat Reader is available by clicking here, you will need this to read the documents. All the downloadable documents referred to on this page can also be found at the bottom of this page.

To help with accessibily Adobe have a set of tools, Adobe Online Tools
Get Adobe Reader Download the latest version of the Acrobat Reader


The Scoping Reports include:

A list of plans, programmes and sustainability objectives which the Development Plan Document should have regard to.

  • Baseline information to be used in the assessment.
  • A list of sustainability issues, problems and opportunities.
  • A list of suggested SA objectives and indicators.
  • A list of consultees.
  • The next steps in the SA process.

2 Scoping Reports have been produced:

  • A more detailed  overall Scoping report for the SA of the Minerals and Waste documents.  Following consultation this Report was revised several times and a final version was produced in September 2006.
  • A Scoping Report for the SA of the Minerals and Waste Site Specific and Preferred Areas document. Consultation will take place between 24th Sept and 5th November

The reports describe Berkshire as one of the most intensively developed areas in the South East but one which also supports a rich and unusual diversity of wildlife and natural features.  The need to balance the demand for minerals extraction and the large and growing production of waste with the protection of the environment is a major challenge.

A list of sustainability objectives are set out in the report  This follows a review of other relevant plans and programmes, analysis of the baseline information and of specific environmental issues and opportunities facing Berkshire.  

The report also sets out how the sustainability objectives will be measured using identified indicators.

 
Section Links
Environment Overview
SEA
Scoping Reports
Scoping Reports Summary
Core Strategy Interim Sustainability Appraisal
Core Strategy Preferred Options Final Sustainability Appraisal
Core Strategy Draft Submission Final Sustainability Report
Landscape Character Assessment
Environmental Data
Appropriate Assessment
Strategic Flood Risk Assessment
Strategic Transport Assessment
 

Download Documents

If you experience any difficulties reading any of the downloadable documents please call the Bershire Joint Planning Unit on 01628 796749
Final Scoping Report, Microsoft Word Document, 3.06 Mb

The production of a Scoping Report is the first stage of the SA and is an opportunity to assess available information to determine the scope and level of detail of the SA.  Following consultation the Scoping Report was revised several times and a final version was produced in September 2006.

 
Final Scoping Report, Microsoft Word Document, 3.06 Mb [opens file in new window]
File Size:
3.06 Mb


Final Scoping Report, Adobe Acrobat Document, 2.98 Mb

The production of a Scoping Report is the first stage of the SA and is an opportunity to assess available information to determine the scope and level of detail of the SA.  Following consultation the Scoping Report was revised several times and a final version was produced in September 2006.

 
Adobe Acrobat Document
File Size:
2.98 Mb

Joint Minerals and Waste Development Control and Preferred Areas Sustainability Appraisal Scoping Report, Adobe Acrobat Document, 153.99 kb
Joint Minerals and Waste Development Control and Preferred Areas Sustainability Appraisal Scoping Report 
Adobe Acrobat Document
File Size:
153.99 kb


Back To Top